As of September 18th, 2006

I've been very busy around here and just now thought about blogging all of my progress. Here's what I've done so far.

In our apartment (I had to make this liveable before doing much else):
1) Textured walls and ceilings
2) Painted
3) Installed ceramic tile in living room
4) Installed linoleum tile in kitchen/dining room
5) Hung entry door
6) Hung two ceiling fans
7) Troubleshoot electrical problem
8) Installed hardwood laminate flooring in master bedroom
9) Hung light in kitchen
10) Framed built in base cabinets and installed sink and counter top
11) Built solid pine wall cabinet with raised panel doors for kitchen
12) Installed tile in master bath
13) Hooked up shower and stool in master bath
14) Hung drywall in master bath
15) Built exterior wall to close off living room and back patio

Well, there's my apartment. Now for the other jobs I've been doing:

1) Hooked up plumbing for two washers in the 2nd floor laundry room (you have got to see these Mexican washing machines)
2) Hooked up some lighting in one of the classrooms
3) Painted an apartment on the 3rd floor
4) Painted the future laundry room on the 3rd floor
5) Hooked up a washing machine in the 3rd floor laundry room
6) Hooked up water supply and drain to a bathroom on the 3rd floor

That's all I can remember at this time. From now on, I'll be updating as I complete each job and I'm also gonna try to work out pictures because they would completely add to the effect.

Upholstery cleaning

Well friends I’m facing a problems with upholstery cleaning in los angeles tht the dust settles on upholstered furniture like on hard surface i need some wen who can do me some favour for cleaning the dust from upholstered furniture. plz let me knw where to go??

Thanks

contact us | site map | Copyright by uniTEC